Cost Management
A production cost lands on the department, the project and the product group at once.
- 01 Code parts
- 02 Tagging
- 03 Accumulation
- 04 Allocation
- 05 Variance
Ключевые возможности
Company, site, department, cost centre, project, product group, channel, activity and a free dimension.
Material, labour and overhead variances calculated separately.
WIP loading per work order and finished goods cost formation.
Selling price against true cost, including landed cost on imports.
Defined keys for distributing overhead to cost centres.
Dimensions do not multiply postings
The traditional workaround is a new cost centre for every breakdown, and centres run into the hundreds. One Tokuva journal line carries nine dimensions, so a departmental report and a project report come from the same row.
Related
Другие модули ERP
Смотреть все →Sunumda değil, kendi akışınızda görün
Üç ürün kartınızı, bir reçetenizi ve bir müşterinizi verin. Uçtan uca tek bir akışı sizin verinizle çalıştıralım: sipariş, üretim, sevkiyat, fatura, muhasebe.