Maintenance
Closing a maintenance order issues the parts and books the expense. One step, not two.
- 01 Breakdown report
- 02 Work order
- 03 Plan
- 04 Release
- 05 Execute
- 06 Consume parts
- 07 Close and post
Capabilities
Fast capture from the floor, converted to a work order in one step.
Calendar or counter based programmes with automatic scheduling.
Create, plan, release, start, complete and close.
Consumed material leaves stock and loads onto the order.
Failures, interventions and costs on one record per machine.
Mean time between failures, mean time to repair, schedule compliance.
Maintenance cost is a real cost
In many plants spare parts leave the store without being written to a work order, appear as an inventory variance and end up in general overhead. Nobody then knows what a machine costs.
Closing a Tokuva maintenance order issues the parts, loads the labour time, posts the total to the maintenance expense account and adds it to the total cost of ownership on the asset record. A year later the question "replace this press or keep repairing it" has an answer in the system.